MAJOR PROJECT LIST

PERMANENT WORKS & VALUE ENGINEERING DESIGN

MAJOR PROJECT LIST

PERMANENT WORKS & VALUE ENGINEERING DESIGN

In a competitive and dynamic construction industry, we are able to assist our clients by leveraging our core capabilities and extensive experience spanning across wide range of services through all stages of projects in all forms of bridgeworks and civil structures.

SEJINGKAT BRIDGE
BATANG LUPAR BRIDGE 1
RAMBUNGAN BRIDGE
BINTULU-JEPAK BRIDGE CROSSING CABLE-STAYED BRIDGE
EMPIRE CITY INFRASTRUCTURE
CENTRAL PARK’S WEAVER BRIDGE
GAMUDA COVE INTERCHANGE DEVELOPMENT
GAMUDA COVE T12 CONSTRUCTION ENGINEERING
DASH (PACKAGE CB1)- CONSTRUCTION ENGINEERING
ELECTRIFIED DOUBLE TRACK GEMAS TO JOHOR BAHRU
MALAYSIA – SINGAPORE HIGH SPEED RAIL (HSR), MALAYSIA
SINGAPORE – MALAYSIA HIGH SPEED RAIL (HSR), MALAYSIA
JOHOR – SINGAPORE RTS
KLANG VALLEY LIGHT RAIL TRANSIT 3 (LRT3)
MAJU EXPRESSWAY II (MEX II)
SUNGAI BESI – ULU KLANG ELEVATED EXPRESSWAY (SUKE)
KLANG VALLEY MASS RAPID TRANSIT (KVMRT) PROJECT- SSP LINE- Underground Package DDC5
WEST COAST EXPRESSWAY, SECTION 9
DAMANSARA-SHAH ALAM ELEVATED EXPRESSWAY (DASH)
KLANG VALLEY MASS RAPID TRANSIT (KVMRT) PROJECT- SSP LINE- Viaduct Package
JAKARTA MRT – Phase 1
HONG KONG – ZHUHAI – MACAO BRIDGE HONG KONG LINK ROAD – SECTION BETWEEN HKSAR BOUNDARY AND SCENIC HILL
KLANG VALLEY – MASS RAPID TRANSIT (MRT) SBK LINE
CHUNG HWA PEDESTRIAN BRIDGE, BRUNEI, 2012
NIGER DELTA EAST-WEST COASTAL ROAD, NIGERIA, 2011/2012
TRAFFIC DISPERSAL SCHEME FOR BRICKFIELDS AREA AND KL SENTRAL STATION – PHASE 1 AND 2, 2011
YEN SO PARK, VIETNAM
DEWAN BAHASA – HANG TUAH VIADUCTS, MALAYSIA- CONSTRUCTION ENGINEERING, 2008/2009
GERBANG SELATAN BERSEPADU – ENTRY & EXIT RAMP VIADUCTS, 2008
GERBANG SELATAN BERSEPADU TANJUNG PUTERI BRIDGE, 2008