BINTULU-JEPAK BRIDGE CROSSING CABLE-STAYED BRIDGE

The cable stayed bridge is a three-span structure with a total length of 495m. This length consists of a main span of 267.6m (between pylon centrelines), side spans of 108.4m (pylon centre to pier centre) and cantilevered decks which extend 5.3m past the end piers (centrelines) and supports the adjacent decks through a ledge detail. The structure is arranged with 2 no. 7.0m wide carriageways, each with a 1.0m wide verge down either side of the carriageway and with 1.5m wide footpaths proved along the deck edges.

Carry out design review on all design drawings, design calculations and specifications and reports related to bridge superstructure, substructure and stay cable system. Provide detailed 3D modelling of the cable stayed bridge (superstructures, stayed cable system, substructures and foundations) and carry out independent checking analysis & design and value engineering.