Condition assessment and reporting of the cable stayed span of the Penang Bridge which the cable stayed bridge spans 440m over the main navigation channel. The assessment including review report and provide comment, review existing date of structural health monitoring system and Penang Bridge Management System (PBMS) and provide comments.