We provide design services for temporary structures at Titiwangsa launch shaft (TU 1) such as weight bridge foundation, emergency staircase, ventilation fan steel support and pipe steel support all in accordance with the design standards and specifications approved.
Waller Beam and Strut for 3 layers of excavation up to 26m deep for HKL Cross Over Excavation. We prepare preliminary design submission and prepare complete design calculation for the temporary structure works. Prepare detailed design inclusive of all steelworks connection details drawings for construction.