Project Consultant for the elevated guideway structures for 5 of 8 packages that make up the total length of 41.5kM for the viaduct. We were involved in packages 1, 2, 5, 6 and 7. Our scope included the concept and preliminary design, followed by the detailed design of the viaduct structures, including the superstructure, substructure and piled foundation design. During construction we are the supervising engineers with staff permanently on site.