Detailed design of 3 span extrados bridge, with maximum span length of 205m, to carry this rapid transit system over the straits between Singapore and Malaysia. The deck consists of a multi-cell concrete box girder formed from precast segmental construction, with RC pylons and substructure and bored piled foundations.