Full detailed design of the foundation (exclude geotechnical input and pile length), substructure and superstructure works including the design of all concrete sections, reinforcement and permanent prestress for the whole Right of Way (ROW) and the affected area beyond ROW from Gemas to Johor Bahru with an approximately of 191km length.